Specifications include, but are not limited to: 1.1 SCOPE OF WORK A. Contractor shall provide all labor, materials, equipment, permits, inspection fees, utility company charges, supervision and other items noted in contract General Conditions necessary to yield completely operable and tested systems as shown on the Plans and specified herein. As shown and noted on plans, details, and specifications the plumbing work includes, but is not limited to, the following: 1. Domestic hot and cold water systems within the mechanical room and chlorination of systems prior to occupancy. 2. Natural gas piping as required within the mechanical room, including all valves, pressure regulators, and other required system equipment. 3. Insulation for piping systems and equipment as specified. 4. Wrapping of all insulation with heavy duty PVC jacket. B. Touch-up painting of damaged materials furnished by this contractor and damaged by this contractor. Each mechanical contractor shall be responsible for replacement/patching of all finish materials which have been disrupted and/or damaged as a result of their construction procedures. All materials shall match original and all work shall be done by experienced field tradesmen. C. Flushing, cleaning, and pressure testing of installed systems. Complete pressure test form. D. Cleanup associated with work of respective trades. E. Maintain records of changes to the drawings as they occur in the field and submit same to the Owner and/or Architect/Engineer as requested within 90 days after the date of system acceptance. See the General Conditions of this specification for additional information.