Specifications include, but are not limited to: This contract is for maintenance repairs of drainage structures, drainage structure and lead cleaning, drainage structure cover replacement and miscellaneous curb and gutter replacement. The Contractor shall bid on a standardized list of pay items common to drainage structure repairs. Specific project locations will not be known at the time of letting and repair locations will be spread sporadically across the jurisdiction area. Specific repair locations may consist of a single structure repair or multiple structure repairs per traffic control deployment. Locations needing repair will be logged in ArcGIS by MDOT. Contractor will be required to use ArcGIS Software to document repairs. Service will either be Standard or Emergency as referenced herein. Submitted standard work orders will need to be completed within 10 days or as directed by the Engineer. Emergency services will require the work to start within 24 hours of notification. Once work commences at a specific site, all work must be completed and location open to traffic within 3 days.