Specifications include, but are not limited to: Maps and documentation will be made available at the mandatory meeting. - All new fiber cable must have a minimum of 48 strands. - Resplice fiber outside of Administration building (D) to bypass routing fiber into building. - Replace Fiber cable ran from A to C on map. Estimated distance is 6,861 ft. Must include fiber slack loops where appropriate on each of the replacement fiber segments. - Replace Fiber cable from point C into datacenter. This fiber does go underground (red color on map). The distance we have for this is 229 ft but this may only be the distance underground to the building. Recommend vendor to review prior to submitting a bid. Also unsure on the condition of the conduit underground.