Winter Mix Asphalt 1. It is the City's intent to purchase Winter Cold Mix Asphalt (UPM) and Permanent Winter Hot Mix Asphalt (HMA). A. The asphalt will be purchased on an as needed basis throughout the year. B. All bid prices are to be quoted F.O.B. Your Plant and loaded on the City’s Trucks. C. Bidder shall have a batching plant location within 10 miles of the City limits. D. All bidders are required to submit with their “Bid Proposal” the manufacturer’s standard published literature and specification sheets pertaining to the asphalt materials being bid. 2. In the event the material furnished does not meet all the requirements, the supplier shall replace the unsatisfactory with acceptable material. The acceptable material shall be provided and delivered at no extra charge to the City. Winter Cold Mix Asphalt (UPM) 1. The supplier of the material shall guarantee the performance of the patching mix to meet the following requirements. A. The material shall remain workable to accommodate climatic conditions, in an uncovered stockpile of 100 tons or more, if applicable, for a period of not less than 12 months. B. Smaller quantities must be reasonably covered. C. Repaired potholes shall not show any significant signs of shoving, rutting, tracking, kick-up or ravel-out within a period of 12 months from the time of repair.