The general description of the Scope of Work (SOW) for this project is to provide the District with a Self-Provisioned Fiber (SPF) system Rebuild connecting four (4) buildings back to Thornapple Kellogg High School. The current SPF is over twenty (20) years old and has been degraded over time from line breaks and line damage. The SOW consists of providing the labor, equipment, supplies and materials, and all operations necessary for the successful rebuild, design and installation of a fully functional, outside fiber optic network, in accordance with the specifications and the accompanying drawings included herewith this RFP. The selected vendor/contractor shall not be required to install any fiber patch cables nor connect any network electronics to the fiber optic network