Work under this section covers the installation of a new fully adhered EPDM Tapered Roofing System for the City of Wyoming WWTP B & V Buildings. In addition, the contractor shall include all related items of work as noted herein or indicated on the drawings or otherwise required to complete the specified elements of work and provide the necessary warranties for this work. B. Tear off down to the existing structural deck. Removal and disposal shall include ballast, gravel surface, built-up roofing, rigid insulation, cants, flashing and counterflashing, wood blocking, and any other materials which may interfere with a complete and proper installation of the new roofing system. C. Furnish and install new fully adhered 60 mil EPDM Roofing System with vapor barrier. Wrap EPDM over the parapet. Install Elevate SP Rail Fascia. D. Furnish and install new average R=30 polyiso and tapered insulation to the deck in low rise adhesive. E. Seal watertight all existing penetrations. F. Membrane Manufacturer 20-year watertight warranty. Upon completion and inspection and acceptance of the work furnish the roofing system manufacturers labor and material full system warranty for a period of 20 years. G. Furnish and install new skylights with fall protection. H. Railing System • V Building: Furnish and install a compliant roof perimeter safety railing system and gate. Basis of design: Diversified, SafePro Component Guardrail Systems or approved equal...