Specifications include, but are not limited to: • This is an upgrade of the components of the video security system. • Work shall include but not be limited to: o Install cabling, security cameras, network switches and servers/storage to support the new and existing cameras plus the growth factor. See specs and drawings. o Replace existing camera monitoring PC’s and provide new PC’s as noted on the drawings and specifications. o Electrical system upgrades for UPS and power to devices. • For new cameras, provide costs to include license software maintenance thru July 1, 2024. Genetec base camera licenses shall be transferred from the owners’ pool of licenses. o New cameras are cameras above and beyond the existing quantity of cameras. Existing cameras and cameras to be replaced already have licensing thru July 1, 2024 • For new monitoring PC’s (not Replaced PC’s) provide Genetec licenses • Fully load the latest Genetec software on the servers and PC’s and upgrade all new and existing camera software to the latest firmware that is compatible with the Genetec software. • Provide full documentation and as-builts of network connectivity and camera locations and camera numbers on red-lined PDF documents. See specifications for full closeout documentation required. • See details and floorplans for UPS and power requirements. • Add surge protection devices on exterior mounted cameras • Add fiber cabling and conduit/raceway from Cotton Admin building to the Records building on Parnall site.