• Replace existing decorative faux columns with new concrete columns at various building entrance locations. • Paint existing canopies at various building entrance locations. • Replace various squares of concrete around the building exterior. • Remove ADA ramp from west side of school and replace a with new concrete stair, metal handrails, guardrails, and concrete landing. Provide new brick veneer. • Replace existing brick veneer at two entrances to main gymnasium. • Replace existing columns w/ concrete cap at two entrances to main gymnasium with new square brick veneer columns. • Provide new limestone parapet cap block at gym entrance canopy. • Provide new waterproofing on foundation wall at location of existing indoor pool. Repair broken pieces of glass window block. Slope grade away from building & provide new sod. • Replace existing concrete stairs, foundation and landing at auxiliary gym entrance with new concrete stairs, foundation & landing. Replace existing metal handrails. Sandblast existing concrete half walls. • Remove miscellaneous debris in damaged stair and repair face with concrete epoxy patch kit.