Scope of Work: 1. Ceiling Tile Removal and Replacement (Stairwell) Work Scope: • Contain the work area. • Place air machine in the work area. • Remove all ceiling tiles (excluding the grid) • HEPA vacuum after removal. • Replace with MARS or Eclipse tiles. • Perform a thorough inspection and address any underlying issues 11-13-23 2. Training Room, Conference Room, and Small Office Area Work Scope: • Place air machine in the work areas. • Contain the work area • Remove damaged ceiling tiles (excluding the grid). • HEPA vacuum after removal. • Replace with MARS or Eclipse tiles. • Clean approximately 2,870 sq. ft. of carpet. • Inspect and clean HVAC vents. • Apply disinfectant and remove mildew or mold. 3. File Rooms Work Scope: • Contain the work area. • Place air machine in the work areas. • Remove damaged ceiling tiles (excluding the grid). • HEPA vacuum after removal. • Replace with MARS or Eclipse tiles. • Clean and disinfect all surfaces. • Inspect and clean HVAC vents.