Consultant shall perform ground survey of work area (approximately 50 acres). Consultant will collect existing underground utility data, where accessible. Record locations of other public and private utilities will be depicted on construction drawings. - Preliminary design services to address project phasing and financial plan. - Project phasing that will have little to no impacts to Airport Operations. - Preparation of final plans and specifications, final cost estimates, and assistance with bidding. - Construction administration services, including inspection, contract administration, materials testing, and preparation of as-built drawings. - Assistance with identifying, securing, and fulfilling state and federal grant opportunities. - This project will require removal and mitigation of freshwater emergent and freshwater forested/shrub wetland. Wetland delineation is currently being completed under a separate contract. - Consultant team will coordinate with EGLE to complete appropriate permitting for wetland mitigation of wetlands to be removed during the construction phase of this project. The Consultant team will assist the airport in procuring wetland credits to mitigate removal of those wetlands.