Base Bid a. Camera cables are installed by others and are not part of this bid. All cables are CAT-6 cables and are terminated and tested b. Provide and install all cameras at all locations noted c. Provide patch cables at the camera and at the comm room. d. Match color of cables. e. Servers and storage is existing at the the Portage Public Schools Administration Building and will be online at time of installation f. Provide all camera licensing for all cameras. Install on the servers. g. Owner will configure software on the servers h. The extent of the work shall be as shown on the drawing and detailed in these specifications B. Post installation documentation a. Each contractor shall provide post installation documentation as per the specifications. Shall include but not be limited to: i. Red-lined as-built drawings ii. As-built detailed connectivity of AV and Network Systems iii. As-built cable locations and cable labels at each location. iv. Mark all splice locations v. Update of all access control locations and equipment at each door vi. Camera locations and camera numbers. vii. Spreadsheet (hard copy and Excel file) for all network, Wireless, telephones and cameras detailing: 1. Mfg. Part number 2. IP Address 3. MAC Address 4. Device number (Camera #, Telephone # etc)