• The MDOC is obtaining a new WIFI cabling system and installation and connection of owner provided Wireless Network equipment. • The scope of this project is the provision and installation of the cabling, raceway and systems as described below, on the drawings and in the detailed specifications. • Electrical Power o Provide and install power circuits where shown on the electrical drawing and as described in the specifications. o Label all outlets and update labels in electrical panels. • Systems Grounding o Install ground bars and bond equipment to the ground bars as shown on the drawings and as described in the specifications • Wireless network equipment shall include: o Wireless Access points –(WAPS) and their enclosures. Interior and Exterior. All these devices and their enclosures are provided by owner, Contractor installs. o Contractor shall install WAPS and WAP enclosures at each building. Owner will provide the WAPS and Oberon type enclosures. • WIFI cabling scope shall include but not be limited to: o Provide, install, terminate, test and label a complete CAT-6A cabling infrastructure to support a new WIFI (wireless) network. o Provide, install, terminate, test and label a complete CAT-6 cabling infrastructure where noted to transition existing cables to racks or cabinets. o Provide and install raceways and cable supports as specified and as required to support all new cabling and Wireless Access Points. o Upgrade and/or add communications racks and equipment to the racks. Make change as noted on the drawings and specifications o See drawings and specifications for raceways and pathways. • Provide new raceways inside and outside building to route CAT-6A cables and fiber cable between buildings. See drawings and specs for raceway requirements • The contract shall include the installation and connection of Wireless network equipment. Work shall include: o Moving of WAPS and enclosures from the delivery truck to the owner’s storage building. o Moving of WAPS and enclosures from the owner’s storage location to the actual building where they will be installed. o Installation of all wireless network equipment. this includes: ▪ Mounting of owner provided WAPS and enclosures in all buildings. ▪ Mounting of owner provided WAPS on the building exterior or poles at the site. ▪ Owner will install Ethernet Switches and provide/install Patch cables at the switches • Provide and install CAT-6A patch cords at each WAP. See specifications for types and lengths required. o Owner will provide and install CAT-6A patch cords at the Ethernet Switches • Verify connectivity lights on all WAPS after the owner installs the Ethernet Switches. • Label WAP patch panels with the WAP number as shown in the drawings and specifications. • The owners (and their Cisco Partner) work on the WIFI network equipment includes: o Obtaining of Wireless network equipment and storage at their warehouse in Michigan. o Deliver of WAPS and WAP enclosures to the site. o Configuration of all wireless network equipment per owners’ recommendations o Labeling of WAPS with WAP number and labeling outside of WAP enclosure with WAP number and building where it is to be installed.