Specifications include, but are not limited to: Plowing snow from the District’s parking lots, driveway, and entrances by 6:00 a.m. whenever snow reaches the depth of two (2) inches as measured on the District premises or when drifting occurs. Questionable conditions need to be pre-approved by the Grounds Supervisor or designated District representative. • Unless otherwise arranged, the Contractor will remove snow on building approaches anywhere that a plow can adequately travel. This includes removing snow on sidewalks. Contractors should generally clear the building approaches with no assumption that any District personnel will shovel the last few feet up to the doors. • Salting will be performed by West Ottawa. We still would like unit pricing per the bid doc, if assistance with salting is needed.