Specifications include, but are not limited to:The contractor must have the capability of removing snow from each location when snow pile(s) become too large. The Facility Manager or their designee will make the determination as to when snow piles must be removed or relocated. 2. The contractor must have the capability of salting the drives and lots. 3. Whensnowfallaccumulationisgr e a t e r t h a n o n e i n c h ( 1 ” ) , ALL areas are to have snow removed and all areas are to be salted as necessary. 4. W h e n s n o w a c c u m u l a t i o n i s g r e a t e r t h a n o n e q u a r t e r i n c h ( . 2 5 ” ) a n d l e s s t h a n o n e ( 1 ” ) , a l l s i d e w a l k s a n d b u i l d i n g access points are to be shoveled or broomed, and salted, using a spreader that will dispense the de-icing material evenly to prevent waste. 5. De-icing (salt) will be provided by the contractor and stored off-premises. 6. The contractor must be available to do repeated snow removals as snow accumulations dictate or as specific requests are made. 7. The contractor will provide the Facility manager or his designee with a copy of the invoice at the completion of each service or within 72 hours. 8. The contractor must have a pager or other means of immediate contact while performing this service for the City. Response time will be 30 minutes after notification. 9. The contractor is responsible for meeting all applicable City, State and federal codes, rules, laws, and regulations. 10. Number of times is an estimate only for purposes of comparing the bids and is not to be construed as a minimum or maximum number of times for service. 11. The contractor is responsible for repairing damage caused by snow removal operations. Repairs must be approved by the Facility Manager.