• Gathering and verifying all base information required for the proper design of the project. • Phase 300, 400, 500 design services as required to produce schematic plans through contract document development. • Design submittals at 15%, 35%, 65%, 100% (Pre-final) & 100% (Final) contract documents for owner review. Submittals shall comply with ANG Engineering Technical Letter (ANGETL) 24-02 – Air National Guard Design Objectives & Procedures (“Tab C”) (or most current version if superseded) • Phase 500 assistance with bidding and contracting process. • Phase 600 & 700 construction administration services • Hazardous material survey of Hangar 7 to meet National Emission Standards for Hazardous Air Pollutants (NESHAP) requirements for demolition • Gathering or preparing all data and design development information that shall ultimately be necessary for plans, submittals, and permit application considerations required for the Environment, Great Lakes and Energy (EGLE), and governing agency approvals. Include as reimbursable expenses. • Provide a proposed design schedule. Design schedule shall be kept up to date through the project and will be incorporated into the Construction Manager’s master schedule. • If requested, provide up to four (4) full-size sealed hardcopy sets of contract documents of each of the (3) design tasks, including addenda, for DTMB and DMVA use during construction. • Macomb County Soil Erosion and Sedimentation Control Permitting (SESC) plan review submittal • Sub-consultants, site surveying, soil borings, field and laboratory testing, printing/reproduction, postage, and project travel (over 100 miles) are to be included as a reimbursable expense.