Specifications include, but are not limited to: Removal of existing roof membrane and all accessories including insulations and installation of new single ply roof membrane system including all accessories (flashing, counterflashing, blocking, coping, etc.) Work included selective removal of a section(s) of standing seam metal roofing at gutter areas, roof board, and rigid insulation down to deck, EFIS wall covering, and related trims and flashings as required for new roof system. Installation of a new EPDM Single-Ply Membrane over a new metal gutter and roof insulation at select gutter areas and installation of new Single-Ply mechanically adhered PVC membrane all other areas. Removal and reinstallation of snow guard system as indicated on drawings.