Specifications include, but are not limited to: 1. The floor, walls, and roof structure shall be made of SIPs. Underside of flooring panels to be treated for exterior exposure by vendor. 2. Complete HSB auto-cad drawings and architectural or engineered stamped construction drawings for building permit review. 3. Supply all lumber for project. Including but not limited to top plate, bottom plate, corner and spline connections, sub-fascia eave and rakes, window and door bucking and all built-up header material consisting of standard or engineered lumber. Supplier to install all lumber around all corner and spline connections, window and door connections in the factory. 4. Panels to be completely cut in the suppliers’ shop. Panels delivered to jobsite with all edge relief for lumber or spline configurations. All window and door openings are cut and relieved with lumber headers. No cutting of panels in field required. 5. Electrical chases pre-installed at all locations specified by Kent County and all lumber to be drilled by supplier in conjunction with wire chases.