DEMOLITION AND ROOF PREPARATION ♦ Remove debris from roof area and properly dispose of all materials off site. ♦ Tear off existing roof system down to the existing deck. ♦ Tear off all base flashings. ♦ Remove existing edge metal. ♦ Remove existing gutters & downspouts. ♦ Remove existing flue pipe flashing, storm collar, and rain cap. ♦ Remove existing rusted flue pipe to first joint below the deck and replace with new to match existing size and type. ♦ Remove existing deteriorated decking. (Unit Cost) DECK REPAIR/REPLACEMENT ♦ Install new decking to match existing deck. (Unit Cost) ROUGH CARPENTRY ♦ Install new nailers to replace damaged or deteriorated nailers (Unit Cost). INSULATION/FASTENERS ♦ Install .25” cover board mechanically fastened to the deck. MEMBRANE/FLASHINGS ♦ Install non-reinforced EPDM fully adhered system. ♦ Install non-reinforced EPDM membrane fully adhered at all perimeters and projections. ♦ Install uncured EPDM flashing membrane at all corners, angle changes, and T-intersections as required by manufacturer. ROOF RELATED SHEET METAL ♦ Install new counterflashing at all vertical and horizontal flashing terminations. ♦ Install new edge metal. ♦ Install new gutters and downspouts. ♦ Install new formed metal flashing, storm collar, and rain cap at flue pipes. ♦ Replace missing or damaged fascia and soffit. (Unit Cost)