Specifications include, but are not limited to:. Snow plowing/removal shall occur when there is snowfall in excess of 1.0 inches as determined by the Director of Facilities Management or designee. Stacking of excess snow will only be permitted in areas specified by the District. Plowing snow into handicapped parking, gates and doorways is NOT permitted. The areas covered under this agreement include all driveways, parking lots and walkways for all 17 schools, 4 administrative/ancillary buildings and 1 closed property. The Contractor will be responsible for snow/plowing the sidewalks at 1 Closed School buildings. FPS reserves the right to adjust this number based on the sale and/or lease of closed school buildings. All areas are to be salted after the completion of each snow/ice removal operation. On occasion, the District may request a salt application without snow removal. The Contractor shall be responsible for all repairs or damages to Farmington Public Schools District property including sprinklers and irrigation systems, parking blocks, fences, brick and gates caused by the Contractor’s equipment, personnel or materials used. Any Contractor leaving the parking lot in an unsatisfactory condition will be required to return within 2 hours permitted there are no obstructions or wait until the end of the school day based on consultation with the Director of Facilities Management or designee to complete the job with no additional compensation.