Specifications include, but are not limited to: Contractor shall: 2.1.1 Secure, coordinate and pay for any necessary permits and inspections. 2.1.2 Sign and block off work areas from vehicular and pedestrian traffic while conducting work and remove temporary signs and barriers as soon as work is completed at each site. 2.1.3 Remove all debris and trash generated in performing the work under this contract from the site and dispose of properly in a manner consistent with all applicable Local, State and Federal laws. Contractor shall not use County dumpsters for disposal. 2.1.4 Existing facilities, including but not limited to grounds, structures, vehicles, utilities, landscaping, fixtures, furnishings, equipment and surfaces and building systems in the vicinity of Contractor’s work shall be protected by Contractor. Any damage to existing facilities shall be reported to the County on the day such damage occurs. Contractor shall promptly repair damage with like materials when ordered to do so by the County at Contractor’s expense. All repairs of damage to existing facilities shall be made to the satisfaction of the County. Failure to repair damage shall be just cause for withholding payment for work, which becomes due