Removal of the Meter Interface Unit (MIU) and/or the Water Meter. The Contractor must disconnect and remove the MIU and/or the water meter, and the Contractor must return the MIU and/or the water meter to the City as directed. G. Class I Demolition Protocols. The Contractor must demolish all structures as if each structure contains class I asbestos-containing materials regardless of whether or not all class I asbestos-containing materials identified on site were abated prior to demolition. H. Set-up of Wetting and Dust Control Equipment. Prior to the start of demolition and debris removal, the Contractor must connect two (2) intact hoses with misting nozzles to the water source(s). If the Contractor uses a hydrant, then the Contractor must use an approved backflow preventer, hydrant wrench(es), drain caps, etc., and the Contractor must properly condition every hydrant after each use as directed by the Owner. The Contractor must use hose ramps to cover any part of the hose(s) that may come into contact with a vehicle or equipment. The Owner reserves the right to require additional ramps if there is any length of a hose that may come into contact with a vehicle or equipment.