1 1.1 PROJECT MOBILIZATION LS 1 $ $ 2 1.2 CONCRETE FORMWORK INCIDENTAL - INCIDENTAL - 3 1.3 CONCRETE SHORES AND RESHORES INCIDENTAL - INCIDENTAL - 4 1.4 CONCRETE REINFORCEMENT INCIDENTAL - INCIDENTAL - 5 1.5 TEMPORARY SIGNAGE INCIDENTAL - INCIDENTAL - 6 1.7 GENERAL CONSTRUCTION ALLOWANCE ALLOW 1 $ 6,000.00 $ 6,000.00 7 3.3 FLOOR REPAIR - FULL DEPTH SF 1800 $ $ 8 3.4 FLOOR REPAIR - CURB / WALKS SF 160 $ $ 9 3.10 FLOOR REPAIR - STAIR NOSING / LANDING SF 20 $ $ 10 3.11 FLOOR REPAIR - SLAB ON GRADE SF 100 $ $ 11 3.12 FLOOR REPAIR - REPLACE PAVERS AT ELEVATOR TOWER SF 260 $ $ 12 4.10 CEILING REPAIR PARTIAL DEPTH - STAIR SF 100 $ $ 13 5.1 BEAM REPAIR - PARTIAL DEPTH SF 160 $ $ 14 6.1 COLUMN REPAIR - PARTIAL DEPTH SF 50 $ $ 15 6.6 COLUMN REPAIR - CORBELS SF 20 $ $