Remove and replace the existing HMA asphalt parking lot in its entirety, add new HMA asphalt parking to the Northeast corner of the site, replace the existing 30” culvert that runs through the parking lot, provide new LED site lighting. 1. Mobilization 1 LS 10. 12” RCP Storm Pipe: 30 LF 11. 36” RCP Storm Pipe: 385 LF 12. 24” Drainage Structures: 1 EA 13. 72” Drainage Structures: 1 EA 14. Connect to Existing Storm Structure: 0 EA. 15. Connect to Existing Storm Sewer, 12”: 1 EA 16. Connect to Existing Storm Sewer, 36”: 1 EA 20. HMA Base, Crushing and Shaping: 7,000 SY 21. Crushed Material Base: 8,900 SY 22. 12” Class II Subbase, CIP: 500 SY 23. Aggregate Base (CIP): 750 SY 24. Aggregate Base (CIP): 100 Ton 25. 2-1/2” Bituminous Pavement: 8,900 SY 26. 6” Concrete Sidewalk/ Driveway: 20 SY 27. Concrete Curb, Type E: 66 LF 28. Turf Restoration: 1,500 SY 30. Electrical: 1 LS