The primary project activities include: Submission of a utility marking request ticket via the state one-call notification system for subsurface work, vegetation grubbing and tree clearing on both sides of entire length of existing site perimeter fencing, removal and disposal of existing perimeter fencing and associated debris, installation of 96” chain link fencing system at location of former fencing system, installation of four man gates at locations to be directed by the Owner, removal of existing site entrance gate and replacement with a 96” high by 24’ length rolling chain link gate at the Kavco Landfill site. The estimated length of the landfill perimeter fencing is 7,920 lineal feet; and Removal and disposal and replacement of an estimated 250 lineal feet of 120” high existing perimeter fencing located around existing onsite remediation system compound. Remediation system compound fencing will be replaced with 120” high chain link fencing that includes two (2), 96” wide swing gates comprised of two 48” wide panels each at locations to be directed by the Owner.