A. All Demolition work is not necessarily limited to what is shown on the demolition plans. The intent is to remove all Mechanical, Electrical, Plumbing and Architectural items required to facilitate new construction. B. Demolition contractor shall be familiar with entire scope of existing conditions and new work prior to starting demolition work. C. Prior to submitting a bid, demolition contractor shall visit and carefully examine the building and site to become familiar with existing conditions and difficulties that will affect execution of work. D. Demolition contractor shall provide temporary 1hr rated ductproof partitions with doors at locations indicated and/or as required to adequately separate occupied areas from construction hazzards, noise, and/or dust. Refer to specifications for additional information. Coordinate all locations with Architect's/Owner's representative. E. Demolition contractor shall provide dust mats at all construction area entrance and exit locations. Coordinate all locations with Architect's/Owner's representative. F. Demolition contractor shall continuously maintain all means of egress and all fire protection features for portions of the building that remain occupied during construction. G. Refer to Mechanical, Electrical and Plumbing drawings for additional information. H. All demolition floor plans, details, sections, etc. are shown for reference only. Visit site to verify existing conditions and demolition to complete new work. I. components such as, but not limited to walls, beams and columns are to be removed to ensure the stability of the building and the safety of its occupants. J. Room names and numbers on demolition drawings relate only to existing conditions.