A. This division includes the demolition and removal of foundation. B. Existing rubbish, trash and junk apart from that of demolished building shall be removed and the entire site left clear of such materials. Except as otherwise shown or stipulated, the demolition work herein stipulated shall be carried to completion. C. All demolition and constructions shall be done in accordance with procedure as established at time of signing the Contract and which shall be scheduled in cooperation with the owner’s occupancy requirements and with a minimum of inconveniences to the other. D. In accordance with the Air Pollution Control regulations of the Michigan department of Public Health, the open burning of debris from demolition of building will not be permitted. The contractor shall dispose of all debris in a sanitary landfill that has been approved by local authorities having jurisdiction. STRUCTURE TO BE DOMOLISHED OR OTHERWISE REMOVED Existing buildings will be either removed or demolished with all physical portions removed from site. Building is 3-story commercial. UTILITIES A. Telephone. Before the starting of demolition, arrange with Verizon Telephone Company for the disconnection of the telephone service in the building to be demolished, the removal of panels and relays and the disconnection of the wiring servicing to the building. B. Mechanical. Before starting demolition, the Contractor shall plug or cap existing storm, sanitary sewers and water lines. The pipes and conduits within the property lines, but not in the immediate vicinity of the excavation for the new construction may be abandoned after plugging or capping at the property line. SALVAGEABLE MATERIALS The owner will remove furniture and equipment other than that to be reused, prior to demolition operations. DEMOLITION A. Upon receipt by the Contractor of notice to proceed with the demolition work, all right, title and interest of the owner in and to building, structure, and other property being demolished and removed by the Contractor, on the premises shall be deemed to be vested in the Contractor, subject to all provisions of the Contract and the following: 1. No right, title, property or interest of any kind whatsoever, in or to land, or premises upon which such building or structure stand, is created, assigned, conveyed, granted or transferred to the Contractor, or any other person or persons, except only the license and right of entry to remove such building and structure in strict accordance with the Contract. 2. Property belonging to public bodies or public service companies shall not become the property of the Contractor by reason of the transfer herein provided for, and the Owner does not warrant title to such property. 3. Except as otherwise provided herein, all salvage and materials become the property of the Contractor and shall be taken from the premises. Storage of materials and equipment on the site will not be permitted. All rubbish and debris found existing on the site at the start of the work should be removed from the premises. 4. Personal property of third persons or of occupants of the building on the site shall not become the property of the Contractor.. SPECIFICATIONS Construct fencing around jobsite. Provide a Port-A-John for workers Provide any and all dumpsters and disposal cost required for this scope of work Replace any concrete sidewalks damaged by this trade to match the existing conditions Cut asphalt paving where necessary Utilities have been disconnected Furnish and install all required traffic control systems. Street or lane closures must be coordinated with the city at least 72 hours in advance Provide dust control measures during all demolition activities Furnish and install controlled Class II sand backfill Furnish and place 4” of screening topsoil, grass seed, and straw Work in this scope to meet MIOSHA requirements Completely remove existing buildings, including foundation walls, floors, and footings Provide all necessary equipment required to complete this scope of work