The Designer will be responsible for: ● Designing the electrical systems needed to support bi-directional EV chargers in the parking lot. ● Designing the integration of the EV chargers with the existing solar array ● Determining any electrical upgrades needed onsite and designing those upgrades ● Coordinating with the existing solar array design team to ensure proper integration. ● Coordinating with the EVSE firm to ensure electrical specifications for charger installation are met ● Conducting an assessment of the building's current electrical capacity and identifying any upgrades needed. ● Designing conduit and routing plans for power lines from chargers to electric panels and solar interconnects. ● Providing load calculations, single-line diagrams, and construction-ready drawings. ● Ensuring that all designs consist of Buy America Build America (BABA) compliant components. ● Interfacing with BWL and assisting in utility, city, and state permitting and utility coordination as needed. ● Delivering all design documents in both electronic and print formats. ● Inspecting the electrical work to ensure the electrical contractors have adhered to the design. ● Other electrical engineering design tasks as mutually identified during the course of the project.