Specifications include, but are not limited to:The SCOPE of the work and GENERAL CONDITIONS includes: 1)The gym floor refinishing must be performed from the period between 6/27/16 and *7/31/16 (*except for LCE and TWL which is to be done during Christmas Break December 2016). All work is to be coordinated with the school district and shall not begin until the successful vendor has received an authorized purchase order from the school district. By offering a proposal, the contractor commits to the school district that the work will be completed within the time frame listed above. 2)Exceptions may be noted on the schedule and pricing document, however the school district reserves theri g h t o r e j e c t a n y p r o p o s a l w h i c h d o e s n o t m e e t t h e d i s t r i c t ’ s n e e d s , r e g a r d l e s s o f p r i c e . 3) Contractors must certify that they are experienced in wood gym floor repair and refinishing and provide several references to include names and phone numbers of recent work. 4) The coatings used shall be Hillyard Gold Medalist Finish and Hillyard 450 Gym Finish both MFMA and UL approved oil modified urethane wood gym floor finishes. 5) The scope of work shall include: a. Following the directions provided by Hillyard on the gym finish product label and or procedures guidelines. b. Pre-cleaning the floor with a water-based cleaner such as Hillyard Super Shine All or Tack It recommended by the finish manufacturer. c. Dry screening the floor with 120-grit screens (at a rate of 250 ft²/side of screen) using a dust collecting device attached to the floor machine.