The project involves the design and installation of a complete Solar PV System at Building 4 which contains the addresses 1737-1747 Green Rd. Modifications included as part of this project include but are not limited to: 1. See plans prepared by IMEG showing anticipated PV array layouts on each building (Attachment K) and electrical connections and specifications listing acceptable product manufacturers (Attachment A). Please note that only the buildings listed in this IFB (above) are to be included in the proposal. 2. Maintain and provide documentation demonstrating that the Contractor and all subcontractors have the required licensing and registration requirements to perform the work outlined in this IFB. 3. Provide supervision and other personnel necessary for the preparation of design specifications required for the project. 4. Create detailed shop drawings for approval, in partnership with Housing Commission staff, for solar installations at Building 4 of Green Baxter Court. Submittals shall include all necessary structural details for racking design and connections to the existing buildings as well as electrical details for connecting the PV arrays to the buildings electrical service including wire pathways, conduit types, etc. The AAHC reserves the right to require additional information as part of the submittal process. 5. Secure building permits and all other paperwork necessary to move forward with the solar installation. 6. Procure and supply all materials and supplies necessary to complete the solar installation. 7. Direct the work of all personnel necessary on-site for the installation or construction of the solarsystem. 8. Install fully functional solar systems with Solar Edge inverters. Integrate the work into the AAHC’s existing Solar Edge dashboard to allow for remote access of real time PV performance. 9. Install a 30-kWh battery in a separate custom-built structure. 10.Work with DTE to ensure proper interconnection of the building to the electrical grid. This includes submitting all necessary applications to the DTE interconnection department and working with the AAHC to execute the interconnection agreements with DTE. Verify that all DTE installed meters are working correctly and properly identified in the DTE billing system. 11.Procure and provide to the Housing Commission all the associated documentation, such as warranties and equipment specifications, for the solar installation. 12.Comply with the Technical Specifications as described in Attachment A.