1. Site Preparation: o Remove dirt and debris from the designated area for the slab. o Excavate and prepare the sub-levels as required, ensuring a stable base for the slab installation. 2. Slab Installation: o Pour a cement slab with dimensions of 90 feet in width, 60 feet in length, and at least 6 inches in depth. o The slab must meet all necessary specifications outlined in the attached document, including but not limited to strength, thickness, and surface finishing. o Apply a finishing spraylock as specified in the minimum standards document. 3. Anchor Points: o Install anchor points as specified in the attached minimum specifications document. o Ensure proper placement and alignment of anchor points to meet the project’s needs. 4. Coordination and Scheduling: o The contractor must cooperate with other vendors on-site, aligning their work with the overall project schedule. o Attendance at regular project meetings, coordinated by BPS, will be required to ensure timely progress and resolution of any issues.