A. Surface Milling and Preparation ● Mill the entire lot to a 1.5” depth (approx. 80,115 sq. ft.). ● Mill designated red areas to an additional 2” depth (approx. 25,680 sq. ft.). ● Compact the gravel base in red areas to prepare for paving. B. Paving ● Install 2” base hot mix asphalt in red areas. ● Apply a tack coat to the entire area to be resurfaced. ● Pave the entire lot with 1.5” surface hot mix asphalt. C. Striping and Marking ● Re-stripe and stencil the parking lot to match the existing layout using durable traffic paint. ● Markings to include: ○ Approx. 3,900 linear feet of white striping ○ Approx. 850 linear feet of yellow striping ○ (21) arrows ○ (6) 'Visitor' stencils ○ (7) Handicap symbols ● Note: Striping includes the east parking lot, which is not being repaved but requires restriping.