Specifications include, but are not limited to: • Contractor will remove all large debris between snow fence and shoreline prior to grading sand. Debris includes but is not limited to trees, building construction materials, stumps, logs, etc. that have washed ashore over the course of the winter. Debris will be removed from Grand Haven State Park by contractor.; • Miss Dig must be contacted by the contractor before any work is performed allowing adequate time for buried utilities to be marked.; • Sand removed from all areas will be taken down to the pavement level 10 feet from edge of pavement unless otherwise noted. (See note referencing critical dune areas); • Clean sand from any area may be placed around the campground playground to bring that area back level with the surrounding pavement.; • Remove all sand accumulations to pavement level from following areas: o day use parking lots ; o islands between parking; o playground area; o paved roadways; o around the entire beach building; o dumpster pads including around fences and sidewalks; o up to the 4x6 fence along Harbor Ave ; o south end of the day use area, ; o south and west side of park headquarters ; o main entrance road,; o entire campground area including next to the toilet/shower building; o entire day use picnic area, ; o sanitation station (including the dog walk area) ; o west end and east side of the Channel parking lot up to the pier rocks and around all chain link fencing(both sides). ; o grading and sand removal surrounding the park lodge will also need to be done. ; o All areas will be clearly defined at the pre-bid meeting. ; • A map will be provided at the pre-bid meeting showing two protected critical dune areas in the park. No movement of sand may take place on or within 15 feet of these two dunes.; • Sand in the day use entrance area/road must be removed and placed back on the beach before any other areas of the park.; • Remove all sand from the day use entrance road and place this sand in the area known as the volleyball area of the park. This sand will be graded to a less than or equal to 5% slope starting at the edge of the campsite pads west to the lake.