Lump Sum Equipment mobilization / demobilization, health & safety plan for construction, schedule, and required permits 2 1,100 Linear Feet Labor, equipment, and materials to repair and grade existing access road 3 60 Cubic Yards General Fill – Labor, equipment, and materials required to place General Fill when called for 4a 3,400 Square Feet Labor, equipment, and materials to widen access road turns and culvert location (Locations #1, #2, #3, & #4) 4b See Schedule of Alternates 5a 2,000 Square Feet Labor, equipment, and materials to construct a Turn-Around Pad (Location #5) 5b See Schedule of Alternates 6 Lump Sum Labor, equipment, and materials to cut branches overhanging road and remove woody vegetation at Location #2 7 12 Project Administration and Leachate Disposal Volume Report 8 192,000 Gallons Leachate Pump and Haul for ~16,000 gallons of leachate per trip. 9 Lump Sum Leachate Disposal Facility Liquid Waste Pre-Approval and Permit 10 192,000 Gallons Leachate Disposal at Licensed Facility, ~16,000 gallons of leachate per trip