Specifications include, but are not limited to: repair/replace of existing Mechanical, Electrical and Plumbing (MEP) systems serving the Grace A Dow Memorial Library; . Identify damaged systems and retain appropriate sub-consultants (including but not limited to: manufacturer representatives, maintenance tradespeople, testing companies and/or MEP subcontractors) or any other expertise required to accurately identify damage, required repairs, write bid plans/specifications, inspect repairs/sign off and generate accurate cost estimations to restore systems to pre-flood condition. Mechanical systems include any type of air-conditioning, heating, ventilation or exhaust systems including their controls. Electrical systems include any type of normal or emergency power, normal or emergency lighting, site lighting, fire alarm, security alarm, security cameras, door access control, and/or data network systems. Connections of affected buildings to existing campus-wide fire alarm and security camera monitoring are to be included