Proposal for the complete removal and replacement of the roofing system at the above-mentioned property. Proposal includes the following items: • Item 1: Removal and Disposal > Provide the removal and disposal of the existing roofing membrane, insulation, gutters, and flashings. • Item 2: New Roofing System • Provide and install a fully-adhered, 60-mil TPO (white) roof membrane system attached with Low Odor or No Odor Products and pitched to ensure proper drainage. • Item 3: Recovery Cover Board • Provide and install one layer of 1/2-inch HD POLY recovery cover board. • Item 4: Flashing and Penetrations Provide and install all manufacturer-required details, flashings, and penetration flashings to ensure a complete and watertight roof system. • Flash all vent stacks, chimneys, and wall connections as needed. • Item 5: HVAC Equipment n Remove and reinstall HVAC equipment as needed...