The project shall consist of furnishing all labor, materials and equipment for the removal and disposal of existing 2-Boiler Systems and installation of 2-New Boiler Systems. SYSTEM DESCRIPTION Current Boiler Systems: Please contact the Utility Department at 313-295-5848 for inquiries. PERFORMANCE REQUIREMENTS General: Remove existing 2-Boiler Systems and provide installed Boiler Systems Specific Labor and Materials: The labor and materials to provide on this project are as follows: Remove existing 2-Boiler Systems and dispose of offsite. Install 2-Raypak Boilers model # H9-1529 @ 1,530,000btuh, 4 stage burners. Fan assisting venting internal to boilers. New vent piping to chimney entrance New Primary Boiler Pumps New 8-stage Boiler Controllers New Step-down Gas Regulators Re-purpose existing outside combustion air wall louver assembly, expansion tanks, back flow prevention and pressure reducing valve Correct parallel piping back to building loop to the preferred based on manufacturer guidelines Include code required Emergency Stop Assemblies at each door of boiler room and 1 Carbon Monoxide Detection Device SUBMITTALS Product Data: Include all permits and state requirements Shop Drawings: Include plans, elevations, sections, details, and attachments to other Work.