1. Complete general work as shown on the drawings and as specified in the following sections: 03 6000 Post Installed Anchors 06 1053 Rough Carpentry 06 1600 Sheathing 06 4116 Plastic Laminate Faced Architectural Cabinets 07 2100 Thermal Insulation 07 9200 Joint Sealants 08 1113 Hollow Metal Doors and Frames 08 4116 Wood Doors 08 7100 Door Hardware 10 2113.19 Plastic Toilet Compartments 10 2800 Toilet, Bath and Laundry Accessories 10 5126 Plastic Lockers 12 2413 Roller Window Shades 2. Schedule, take delivery, inventory, store and install all items noted as “Install Only” above. Provide a list of material received each day to the Construction Manager’s Superintendent. All items not so noted are to be furnished and installed. 3. Take field measurements, onsite surveys and inspections required for the ordering and/or installations of items provided under their scope of work. 4. Furnish and erect all blocking shown on drawings or as specified in Miscellaneous Carpentry. Include all blocking not shown but incidental to your scope of work. 5. Roof sheathings/blocking as shown. Prior to installation schedule a meeting with the roofing contractor to coordinate requirements. Notify the Construction Manager’s superintendent of the meeting so that he/she can be in attendance, furnish, for others to install, anchor bolts required for blocking installation. 6. Installation of electric strikes.