1. Complete Direct Digital Control systems and related work as shown on the drawings and as specified in the following sections: 07 8413 Penetration Fire Stopping 23 0900 Instrumentation and Control for HVAC 2. Motorized dampers. 3. Coordinate with electrical rough-ins. 4. Coordinate with related mechanical system installations. 5. Reroute and re-land control wiring ran in window frames that are getting removed around MS courtyard reference note 1 on sheet M 101. 6. Fire resistant joint sealers as specified in Section 07 8443 for all building management associated penetrations. 7. Subcontractor must coordinate its work with the work of other subcontractors at the site to eliminate conflicts. No additional costs as a result of a lack of coordination will be accepted. 8. See General Comment re: Access Doors. 9. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category. 10. See General Comments re: fireproofing.