1. GENERAL 1. It is understood that the CONTRACT DOCUMENTS, as they relate to the “work”, are not complete and detailed in all respects. However, the WORK of this agreement includes all work indicated, detailed, implied, inferable and necessary for complete, fully functioning system, product or installation in accordance with all applicable codes, standards, authorities having jurisdiction (AHJ), and the CONTRACT DOCUMENTS. 2. CONTRACTOR shall obtain all Building, Mechanical, Electrical, Plumbing, or other required permits, at their own expense. 3. CONTRACTOR shall perform daily clean-up of own work, including continuous cleanup of own work to dumpsters. 4. CONTRACTOR shall be responsible for supplying dumpsters and off-site removal of debris. 5. Public restrooms are NOT available at BC Jail, and the CONTRACTOR is responsible to supply portable toilets for their employees. 6. As this is a SINGLE PRIME CONTRACTOR project, the CONTRACTOR is responsible for all work detailed in the DRAWINGS and SPECIFICATIONS. 7. The WORK under this contract must be completed by June 30th, 2026. Work must cease between December 1st and March 31st, and no work shall be left incomplete during the winter months. Additionally, no work may be performed when outside air temperature drops below 50 Degrees Fahrenheit.