Complete demolition and off-site disposal of all items of work as shown and/or specified except as noted below. Includes all architectural, structural, mechanical, and electrical demolition. Removals to include, but not limited to, concrete walls, saw-cutting of concrete and masonry walls/foundations, steel framing, existing equipment, cabinets, ceilings, flooring, piping, conduit, etc. Includes all labor, material, accessories, and equipment to complete this work. Furnish and install all hoisting, scaffolding, temporary platforms, chutes, etc., as required for the performance of this work. Provide, maintain and remove barricades, signage, and other safety precautions that may be required where removal of equipment and/or structure leaves unsafe conditions.