1 Subcontractor shall include labor and material to disconnect and salvage all existing equipment and cabling within existing technology rack. Existing rack to be removed and disposed of. 2 Subcontractor shall furnish and install new technology rack per drawings and specifications. 3 Subcontractor shall include re-installation of technology equipment salvaged and cabling from existing rack. Include reconnection of all cabling to equipment. 4 Subcontractor shall include installation of owner provided equipment within rack. Refer to drawing schedules 5 Subcontractor shall furnish and install full Stadium Audio System per drawings and specification requirements 5 All materials and workmanship shall conform to all applicable Code requirements, and the requirements of the local, state and federal authorities having jurisdiction...