ATHLETIC TRACK PAVING (3.0 INCH) SPECIFICATIONS (9,5 Ft Wide @ 7,500 SF): 1.1.0 PREPARATION: 1.1.1 Inspect base surface for possible weak points or undercut areas. 1.1.2 Advise the School of any such areas and provide an estimate for removal & base replacement including proper compaction. 1.1.3 Regrade and shape existing pulverized asphalt for positive slope and compact for density. 1.2.0 3 INCH ASPHALT PAVEMENT: 1.2.1 Apply MDOT SS 1H Emulsion course (Bond coat) for adhesion (as applicable). 1.2.2 Furnish and install 3-inch lift (150 tons (+/-) of MDOT #36a commercial wearing course of hot mix asphalt (HMA) including compaction. 2.0 STRIPING: 2.0.1 Shall include 4-inch white striping to identify three separate running lanes (per owners’ satisfaction).