1. Project Overview This project involves the removal and replacement of deteriorated asphalt pavement, application of a protective seal coat, and re-striping of parking lot or roadway markings to restore functionality. 2. Asphalt Replacement 2.1. Demolition & Removal • Saw-cut and remove approximately 7,000 SF existing damaged asphalt to a depth of 2-4 inches. • Haul away and dispose of debris in accordance with local regulations. 2.2. Subgrade Preparation • Inspect and recompact the existing base. • Add and compact new aggregate base material as needed. 2.3. Asphalt Installation • Install new hot mix asphalt (HMA) to a depth of 4 inches. • Compact asphalt using vibratory rollers to achieve proper density and smoothness.