1. Alternate No. 1: Toilet Rooms #122 & 124, #173 & #174, #251 & #253, #368 & #369. a. Base Bid: Demo and replacement of ceramic flooring & wall base, countertops & lavatory sinks as indicated on Demolition Plans A001, A002, A003. Interior sheets I101, I102 & I103, and Plumbing Sheets P100, P101 & P102. b. Alternate: Existing flooring, countertops & lavatory sinks to remain. 2. Alternate No. 2: KDPS Corridor Carpet a. Base Bid: Demo and replacement of existing carpet in Corridor 221, Corridor 266 & Vestibule #267 and associated wall base as indicated on Drawings A002 & I102. b. Alternate: Existing flooring & wall base to remain. 3. Alternate No. 3: Town Square #127 Ceiling Tile a. Base Bid: Ceiling Tile AC-1 & AC-2 as indicated on Drawing A107. b. Alternate: Substitute ACT-7. 4. Alternate No. 4: Connect Room #137 Ceiling Tile a. Base Bid: Ceiling Tile ACT-8 as indicated on Drawing A107. b. Alternate: Substitute ACT-7. 5. Alternate No. 5: Covered Bike Shelter a. Base Bid: Provide covered bike shelter & screening on west end of site as shown on Drawing AS01, and structural drawings S101 & S104. b. Alternate: Provide concrete pad and bike racks only, no covered shelter. 6. Alternate No. 6: Natural Gas Grille Hookup a. Base Bid: Provide Natural gas hookup & emergency shutoff from building to exterior for gas grille at KDPS patio (@ Column line 12A) as indicated on Drawing P101. b. Alternate: Extend natural gas to new gas range in Kitchen #197, no extension to exterior, no exterior hookup point or associated emergency shutoff. 7. Alternate No. 7: Installation of Operable Partition a. Base Bid: Install 54 STC rated manual operable partition & track, as well as associated support posts/beams, wing walls, bulkheads, blocking & acoustically separated assemblies as indicated on Drawings A102, 8/A104 & 9/A104, A109, 1/A114 & Structural drawing S104, as well as Specifications Section 10 2239 FOLDING PANEL PARTITIONS. b. Alternate: Install Structural support posts & beams for future operable partition per Structural drawing S104 and wing walls per Drawing A201 & 8/A104. Provide ACT-1 ceiling in place of new gyp. Bd. bulkheads.