• Contractor shall provide and install equipment, cabling, software and configuration to replace and upgrade the existing Programmable Logic Controller (PLC) system. This includes the provision of a new Ethernet network and CAT- and fiber optic cabling required to connect the PLC devices throughout the building see the drawings and specifications for the extent of the systems to be provisioned. • Upgrade the audio intercom system to integrate the intercoms to the PLC system. System shall work as it works currently after installation. Work with the owner to establish baselines for communications, control and integration of the PLC system to the existing video security system, existing access control system and upgraded intercom system. • Provide and configure new software to allow control of the PLC system and audio intercom system thru the PLC system. • Install CAT-6 cabling and termination/testing for the connection of the PLC system. Install Fiber cabling and termination/testing of the fiber to facilitate Ethernet connectivity between the SEC1, SEC2 and SEC3 communications rooms. • Provide and install all patch cables and interconnection cables to fully connect the PLC System, Ethernet network and Intercom systems. • Configure the new equipment and software to match and extend the current PLC and intercom systems. • Provide new system as-built documentation and warranty as described in the specifications and on the drawings.