5.3.1. Meet jointly with representatives of the District to exchange information and agree on details of equipment arrangements and installation interfaces for a Network Electronics project. 5.3.2 Have sufficient resources in order to complete the SOW within the allotted timeframe and shall, upon request, demonstrate that they have the resources necessary to complete the SOW within the specified timeframe. 5.3.3 Furnish all labor, supervision, tooling, and miscellaneous mounting hardware and consumables for the Network Electronics system installed at the District. 5.3.4 Test (100%) all hardware for defects in installation and to verify performance under installed conditions. 5.3.5 Provide installation, administration, testing, and “As-Built” documentation required from and/or maintained by the selected vendor/contractor during the course of the entire network electronic installation project.