A. Bridge File review In this phase of the work the CONSULTANT will take several steps to review the documentation for each bridge and register on-line to be assigned the forms to complete. 1. The QTL must register on-line with the MDOT MiLogin/MiBridge bridge data collection application, at the New Consultant / Inspector Registration”. This person’s name will appear on all inspection documents. 2. Find the Berrien County Road Department bridge owner’s name and add it to the list on the right. 3. Review the bridge files, and become familiar with the documentation on the structures and the respective load analysis for each bridge at the Berrien County Road Department office. 4. Obtain paper copies of the previous inspection reports for use in the field.