Specifications include, but are not limited to: 1. The contractor shall provide snow removal services at each contracted site for snow accumulation amounts of two (2) or more inches. 2. Contractors are required to remove snow from parking lots, driveways, and sidewalks identified in the walk through. 3. Contractors are required to remove snow up to three (3) feet from doors. 4. Contractors must exercise care to avoid contact with buildings and other structures in and around the buildings. All damages to District facilities must be reported to the Health, Operations and Athletic Supervisor on the day of the occurrence. 5. Contractors are responsible for placing flags at obstacles in and around the facilities to mark such obstacles. Such placement should take place in advance of the plowing season. 6. Contractors must meet time requirements provided on the attached sheet for completion of the work at each site. 7. No equipment is to be used that is larger than a skidster and a pick-up truck with blade unless authorized by the Director of Operations. 8. All contractors must provide phone numbers where they can be reached 24 hours a day