Specifications include, but are not limited to:The West Central Street and Route 30 Work for this project consists of installing approximately five thousand eight hundred and seventy-five (5,875) linear feet of eight-inch (8 ) diameter water main through combination of open cut, sliplining and pipe bursting. Work also includes open cut installation of approximately three hundred and thirty (330) linear feet of ten-inch (10 ) diameter water main. The Health Center forcemain Work for this project consists of installing approximately one thousand six hundred and seventy-five (1,675) linear feet of twelve-inch (12 ) diameter sewer forcemain through combination of open cut, sliplining and pipe bursting. The Contractor shall supply all labor, materials and equipment necessary to complete the work shown on the Contract Drawings and hereinafter contained in the Specifications.