Specifications include, but are not limited to: 1. Awarded contractor to provide stamped drawings for review and approval by MBTA. 2. Local or State permit required. 3. Contractor to provide all equipment required to decommission old lighting fixtures/transformers and install new lights fixtures. 4. MBTA will not provide support for HVAC and Lighting work. 5. Contractor to provide examples of working near Catenary lines. 6. Remove and proper disposal of existing wiring, lighting fixtures/transformers in car house. 7. Install (20) High Bay LED Lights with supports and wiring. 8. Install separate switches for operating each of the (4) four rows of lighting. 9. Install LED task light over workbench area with switch. 10. Install (4) new 277V Circuit Breakers, existing 480V Panel. 11. Install (2) Split-Duct AC Units; - Office area to include two fan units - Storage Area with one fan unit